Oakley, Ohio Hall Bathroom Remodel

This 100-year-old bathroom remodel in Oakley was a total gut project due to the galvanized water supplies and cast iron waste lines in the walls and floor framing all needed to be replaced.


About The Design

Due to the limited space, in the room and the window location, the shelving unit, glass panel, half-wall are all customizations that made the space more functional. The shower control valve on the left wall enables the homeowner, as an option, to later add a glass panel on the right side of the tub and a hinged glass door on that left side of the tub. The contrasting subway tile and grout lines created crisp and clean lines. The niche backdrop is a solid piece of porcelain tile.

Bathroom remodel in Oakley


Bathroom remodel in Oakley


Bathroom remodel in Oakley


Bathroom remodel in Oakley


Bathroom remodel in Oakley


Bathroom remodel in Oakley


Before

Before Bathroom remodel in Oakley


BACK TO BATHROOM REMODELS